Lampposts Transformed into Charging Stations: New York State’s First Chargers Now Operational
EV charging startup Voltpost officially launched New York State’s first lamppost-mounted electric vehicle chargers in the Village of Larchmont, Westchester County, on August 12. This deployment marks the introduction of a new model that rapidly expands charging networks by utilizing existing public infrastructure. The first chargers are installed in a parking lot at 61 Wendt Avenue in Larchmont, near a train station and commercial district, and are now open for public use.
Voltpost’s “Air” chargers feature a lamppost-mounted design, with each lamppost capable of supporting two charging units. Each unit delivers a maximum output of 9.6 kilowatts, supporting Level 2 charging with J1772 connectors. The chargers are installed approximately 10 feet (3 meters) above ground, effectively protecting them from severe weather and vandalism, and are equipped with retractable cables for user convenience. According to Voltpost, this design can fully charge an EV battery in 6 to 10 hours, making it ideal for scenarios where vehicles are parked for extended periods, such as residential areas, office buildings, or shopping center parking lots.
Compared to traditional ground-mounted charging stations, lamppost chargers can be installed in just a few hours, with significantly lower deployment costs and a smaller footprint. Jeff Prosserman, CEO and Co-Founder of Voltpost, stated, "We are proud to partner with the Village of Larchmont to transform existing infrastructure into a charging network, providing residents with convenient access to clean transportation charging. This model enables us to bring reliable, convenient charging to communities where people live and park today, faster and at a lower cost for municipalities."
